Friday, February 13, 2009

90% done, 90% to go

It was always going to take longer to build the first of the flatpacks as we (designer/pre fabricator Geoff, and myself) are working to make it as simple and easy for the next wave of builders who are interested in this design, but even I'm starting to get a little disappointed in my weekly progress. Every job now is small and fiddly, and needs to fully cure before the next can be started. 
The plan is to dry assemble the seat today, and then wet assemble it tonight- so touch wood, by tomorrow I should have a picture of a curing seat.
AUS32 is coming along, with the inside laminate of carbon going in last night, the techniques we learnt from doing mine made that a much simpler and easier job.

Anyway, back to the shed

No comments: