Okay, well in the last few days AUS31 has had:
- Mast stepped to check stay lengths so they can be made
- a couple more coats of undercoat and been rubbed back
- it's slider fittings for the boom (GNAV, Mainsheet blocks and outhaul) - the first of these is being bagged right now - the pic shows that I pulled my first full vacuum (I've only gotten to 95 before, so I'm getting better).
AUS32:
- All carbon is on on the inside
- winglets/carbon chainplates are glued in
- the gunwales have been faired to meet the dancefloor.
So things are progressing well, but with the Nationals less than a month away things are going to be tight.
No comments:
Post a Comment